Education finance · Public programme · May – Oct 2023
Re-engineering a national scholarship-loan programme
Re-engineered a government scholarship-loan programme end to end. Redesigned the selection process to reduce turnaround from 2–3 months to 3–4 weeks through automated, weighted 70/30 scoring, replacing commission interviews. Aligned every TO-BE process step with the governing regulations. The government implemented the redesigned process in 2025.
- Client
- National scholarship-loan programme for study at top-50 universities, Mongolia
- My role
- Process workstream lead — sole BPSolution representative in a joint MOSA team
3–4 weeks
designed selection time, down from 2–3 months
70 / 30
weighted scoring — documents and a one-day exam — replacing commission interviews
4 → 1
manual ministry processes (5–20 steps each) reduced to one annual approval in the TO-BE design
P0 → P3
process-maturity target on Hammer’s PEMM, from P0 (disorganised, unreliable)
Selection, before and after
Before · AS-IS
Run by the ministry and an ad-hoc commission · 2–3 months
- 1
Document-stage screening
- 2
Appoint a selection commission
- 3
Notify and gather commission members
- 4
In-person and Skype interviews
- 5
Interview-stage decision — criteria and results not published
- 6
Email applicants and post on the website
- 7
Minister’s order, issued in June
After · TO-BE design
Run by the fund and scored automatically · designed for 3–4 weeks
- 1
Document score, 70% — open, updated automatically
- 2
Exam date announced openly
- 3
One-day general exam, 30% — no human judgement
- 4
Results published the same day
- 5
Post on the website and send next-step guidance
- 6
Order and decision issued
- S
Situation
A national programme provides collateral-backed loans to 20–30 students each year to study at the world’s top 50 universities, selected from more than 100 applicants. The process was fragmented across the ministry, the fund and applicants. Information was scattered across websites and Facebook, records were held in Excel, email and paper files, and application deadlines were unclear.
At the ministry, four major manual processes, each involving 5–20 steps, kept a four-person unit fully occupied during each selection round. A commission, whose composition varied with the leadership of the time and often involved representatives from several organisations, selected students through document reviews and in-person or Skype interviews. Results were not published.
Meanwhile, the fund operated 25 scholarship, loan and grant programmes across 4–5 separate systems. Each selection round took 2–3 months. An assessment using Hammer’s Process and Enterprise Maturity Model (PEMM) rated the process at P0 — disorganised, unreliable and unstable.
- T
Task
As part of a joint team established through MOSA, Mongolia’s technology association, with one specialist representing each member company, I represented BPSolution and led the process workstream.
My responsibility was to re-engineer the entire lifecycle, from the public application call through to loan repayment, making selection transparent, criteria-based and free from individual judgement, while raising process maturity from P0 to P3.
- A
Action
- Mapped the current process: Modelled the end-to-end AS-IS process and selection sub-process in BPMN using Camunda over two months (May–June), covering the ministry, the fund and applicants.
- Assessed process maturity and performance: Evaluated the process against QCDM (Quality, Cost, Delivery and Morale) metrics and Hammer’s PEMM (P0–P4) using Excel. Identified gaps in transparency, automation, digital channels, controls and accountability.
- Identified the structural issue: Found that most manual work sat with the ministry, rather than with the fund responsible for operating the programme.
- Redesigned student selection: Replaced commission interviews with a standardised 70/30 scoring model:
- 70% document assessment: priority field, university subject ranking, IELTS/TOEFL scores, GPA and work experience.
- 30% general examination: a one-day exam, with results announced on the same day.
- Redistributed and automated processes: Transferred the ministry’s four manual processes, each involving 5–20 steps, to the fund for automation. Reduced the ministry’s role to one annual approval step covering priority fields and the list of eligible top universities. Removed the selection commission and its working group.
- Managed stakeholder resistance: Addressed concerns from ministry staff and applicants who objected to the new examination. Used evidence from previous years to demonstrate the limitations of subjective selection, including weak loan repayment and graduates not returning to Mongolia. As the redesigned process clarified previously ambiguous rules and reduced manual intervention, resistance declined and the government supported the redesign.
- Aligned the process with legislation: Worked with the ministry’s legal representative to ensure every TO-BE process step complied with the law and was incorporated into formal regulations.
- Defined the technology requirements: Handed the TO-BE design to the technology workstream, where other MOSA member companies developed the technology solution. Specified one integrated system and shared data store to replace the fund’s 4–5 separate systems across all 25 programmes.
- R
Result
- Faster, transparent selection: Designed to reduce the selection cycle from 2–3 months to 3–4 weeks through automated scoring, same-day results and consistent 70/30 assessment criteria.
- Operational efficiency: Transferred four manual processes to the fund for automation, freeing a four-person ministry unit from selection operations.
- Integrated and inclusive solution: Designed a unified data architecture replacing 4–5 systems across 25 programmes, with a Credit Guarantee Fund option for applicants without collateral.
- Governance and accountability: Introduced independent annual audits, secured government support and aligned the TO-BE design with legislation and regulations.
- Handed over the TO-BE process design to the government stakeholders and IT team for implementation.