Insurance · Operational diagnostics · Dec 2023 – Apr 2024

Employee Workload and Process Efficiency Audit – Insurance

Gave a mid-sized insurer its first objective, task-level view of workload across nine departments — leading the client to reassign work, rebuild KPIs and commission two follow-on engagements.

Client
A mid-sized insurer, Mongolia
My role
Engagement lead — analysis, findings and recommendations (Co-founder & CEO | Process Transformation Lead, BPSolution) — team of 3

9 departments

Business and support departments measured, task by task

1.3–2.6 idle hours

Measured average daily load of front-line staff and managers

Level 3

Process maturity: processes defined, but not yet managed end to end

From suspicion to action

1 · Before

A suspicion, but no evidence

  1. 1

    Management suspects workload is uneven, but has no evidence

  2. 2

    Every unit reports high KPI and action-plan scores

  3. 3

    High turnover — knowledge leaves with people

2 · Measure and analyse

Dec 2023 – Apr 2024 · nine departments

  1. 1

    Full-day direct observation and structured interviews, role by role

  2. 2

    Load and idle time per role — staff 6.7 h / 1.3 h idle, managers 2.6 h idle

  3. 3

    Root causes across people, process, systems and performance; four recommendations

3 · Act

The client acts on the evidence

  1. 1

    Work reassigned between roles

  2. 2

    KPIs rebuilt

  3. 3

    End-to-end analysis of corporate sales, then a BPM Suite implemented

Pain pointChanged
  1. S

    Situation

    A mid-sized insurer, already an RPA client, had documented processes and high departmental KPI scores. However, management suspected uneven workloads and lacked an objective view of how employees spent their time and how processes actually operated. High staff turnover further increased the risk of losing operational knowledge.

  2. T

    Task

    At management’s request, lead a two-wave, employee-based workplace audit across nine departments. Measure actual workloads, identify process inefficiencies and root causes, and recommend improvements.

  3. A

    Action

    1. Conducted two audit waves: Covered three sales departments (December 2023–January 2024), followed by six business and support departments (March–April 2024).
    2. Reviewed existing documentation: Examined departmental charters, job descriptions, KPIs, action plans and system reports before starting fieldwork.
    3. Measured actual workloads: Selected representative employees, typically one senior and two staff per unit. Recorded daily activities task by task through direct observation and structured interviews.
    4. Quantified workload and idle time: Calculated average daily workload by role, cross-checked findings against CRM data and estimated annual effort using a standard 2,080-hour working year.
    5. Mapped cross-functional processes: Traced workflows between departments, customers and suppliers to identify bottlenecks and inefficient handovers.
    6. Assessed process maturity: Evaluated the organisation at Level 3 — processes were defined and documented but not yet managed end to end.
    7. Identified root causes: Analysed findings across four dimensions: people, processes, systems and technology, and performance and control. Presented findings and recommendations to management.
  4. R

    Result

    • Established an objective workload baseline across nine departments: Measured business and support departments task by task, rather than relying on self-reported KPIs.
    • Identified workload imbalances: Front-line staff averaged 6.7 hours of daily workload with 1.3 idle hours, while managers averaged 2.6 idle hours per day.
    • Exposed hidden operational waste: Identified nine minutes per employee per day spent recording CRM meeting notes, alongside time lost correcting system and data-entry errors.
    • Delivered four improvement recommendations: Standardised processes resilient to staff turnover, aligned KPIs and live dashboards, bottom-up continuous improvement, and a shared knowledge hub.
    • Triggered follow-on engagements: Management reassigned work, began rebuilding KPIs, commissioned an end-to-end corporate sales analysis, and subsequently purchased and implemented our BPM Suite.